建立发动机的调整


Simplified commissioning for greater efficiency

Our Building Tune-up program is a simplified option for building owners who want to implement low- and no-cost energy-efficiency opportunities without the full commissioning process. The program helps you analyze your building’s energy consumption, leverage your building operator’s expertise to implement efficiency measures, 并获得奖励.


你得到了什么

If you qualify for our 建立发动机的调整 program, you will receive:

  • A comprehensive on-site review of your facility's systems once committed.
  • Recommendations for low- and no-cost operational and maintenance (O&米)的改进.
  • Identified capital projects, including energy-efficiency upgrades.
  • O培训&M staff to identify, track and maintain energy savings.
  • Tune-up report documenting how to operate your building efficiently and to maintain realized energy savings.


实施激励

Once the tune-up has been implemented and all required training and documentation provided, you’ll receive the implementation incentive. This incentive is provided for the successful completion of the tune-up process and is not tied to how well the building has performed up to this point.

PSE all (electric or electric/gas)
电 天然气$5,000

PSE电气设备 only (other gas)
电$4,000

PSE燃气服务 only (other electric)
天然气$2,000

总激励最大值
天然气75% of commissioning professional’s fee


These incentive amounts are the minimum implementation incentive amounts and will increase for buildings over 100,000平方英尺.


第一年业绩奖励

Once the building maintains efficient operation for one year after receiving the implementation incentive, earn an additional incentive if you’ve reached the 6% savings target. Most projects see a 60%–70% reimbursement of eligible project costs, including commissioning and improvement investments.

You also have the option to implement monitor-based commissioning measures (read more 在这里), which would qualify for a second-year performance incentive at the rates listed below.

电动力
PSE电气设备
电$0.05 /千瓦时保存

天然气激励
PSE燃气服务
天然气$0.80 /克卡保存

总激励最大值
天然气合格项目成本的100% *


*The maximum total incentive is 100% of eligible project costs for those projects realizing exceptional energy savings. Most projects receive total incentives covering 60%–70% of eligible project costs. Eligible project costs include commissioning provider’s fee, cost of operational improvement(s) and/or energy-efficiency upgrades.

你有什么资格?

Knowing that each building is unique in operation and characteristics, below is a quick list of indicators of your building’s potential. How do you know this program is for you?

  • Building has 50,000 or more square feet of conditioned space and is at least 75% occupied.
  • Building is managed by automated controls.
  • Energy use is higher than expected and/or trending upward.
  • Maintenance has been deferred to some extent.
  • 建筑啊&M staff desires efficiency training.

承诺

A successful tune-up project is the result of understanding and commitment to the PSE requirements and tune-up process prior to getting started. Below are some key contributing factors:

  • 管理承诺
  • 专门的员工时间
  • Implementation of identified opportunities*

*The customer is only required to implement measures that have a two-year (or less) simple payback with a total implementation cost of no more than the following for each type of customer: $0.15 per square foot for dual-fuel customers, $0.10 per square foot for electric-only customers, and $0.10 per square foot for gas-only customers.

如何申请

To get pre-approved for the 建立发动机的调整 program, complete the 网上自订拨款申请.

额外的信息

找一个调校专家

All of PSE’s commissioning and tune-up programs require a minimum level of experience in addition to a high-level understanding of building energy using systems. Successful providers have strong interpersonal skills, as well as the ability to investigate, implement and verify energy-efficiency opportunities.

PSE and the City of Seattle, through NEEC, maintain an updated list of prequalified specialists who are qualified to participate in our 建立发动机的调整 program. We encourage you to find a professional from that list. If you have a person you wish to use that is not preapproved by PSE or the City of Seattle, you can submit the tune-up specialist application 获得预先批准.

观看这个视频了解更多

请听杰森·海厄特的报道, 我们的调试项目经理, to learn more about our three commissioning programs and how they can help you. This video is a recording of a Coffee and Conversation virtual event from March 2023.


问题? 与我们联系 commissioning@volamdolong.com.



商业能源
向能源顾问咨询

For personalized advice, contact an Energy Advisor.

现在十大彩票平台

或致电1-800-562-1482.